Give it a goal
Last week I scrolled back through a long build session and counted how often I typed one word.
"Do next." "Go ahead." "Done." "Start next phase." Over and over. Each phase of the work finished, and then the build sat and waited for me to say continue.
What did "continue" cost?
Not the typing. The waiting.
In My favorite feature I wrote about Remote Control, answering from my phone so a phase never waits long. That helps when I can reach it. In a meeting, on a drive, or asleep, I cannot. The build just stops.
So I asked a question. Would it help if I gave you a goal?
What is a /goal?
A finish line, said once. Claude Code has a command for it. The session keeps working until it judges the goal met, and if it stops early, it is sent back to work.
Mine was for the Civil 3D MCP server from What would it take?:
"keep working on finishing the C3D MCP without me."
Plus a spending limit, so "without me" did not mean "without a limit."
We wrote it the way we write everything now, in a planning session first, which I covered in Plan to win!. What does finished look like? What comes first? Where should it stop?
What changed?
The one-word prompts went away. It picked the next step, built it, tested it, and moved on. I came back to finished work instead of a question that had been waiting since I left.
Is there a catch?
Yes, and it is a good one.
It did not finish. Three checks were left, and each needed a person sitting at Civil 3D: undoing a change live, answering a confirmation dialog.
So it said so. The goal is not met, here is what is left, here is why it needs you. Then it stopped, instead of spending the limit on busy work.
A goal does not remove the parts that need you. It removes the part where the work waits on you for no reason.
Write the goal so it knows what done looks like, and what it is not allowed to do alone.
Be Better! ...give it a goal.